Guide

How to legalize unpermitted work in Florida

Florida generally requires a permit for construction and remodeling that changes a floor plan, such as additions, accessory dwelling units and garage conversions. If yours was built without one, a retroactive permit is often possible, as long as the work meets minimum code. Here's how it works.

Why it matters

Unpermitted work tends to surface at the worst time: during a buyer's inspection, a lien search, an insurance claim or a code enforcement visit. Legalizing it on your schedule is cheaper and less stressful than doing it under a deadline.

The five steps

  1. Zoning check

    We meet with the planning department for an over-the-counter zoning review. If the work doesn't meet minimum code, we tell you what has to change.

  2. Plans

    Our architects and engineers draw and certify the plan set the department needs, such as site, floor and electrical plans. No need to find your own.

  3. Plan review

    We submit the plans for review, respond to comments and get the retroactive permit issued.

  4. Inspections

    Inspectors check foundations, framing, electrical, HVAC, mechanical and insulation, and may ask for corrections. We schedule and manage each one.

  5. Final and closeout

    Once the final inspection passes, the permit is closed and, where required, a Certificate of Occupancy or Completion is issued.

Getting a building permit after the work is done

Our team of permit expediters knows Florida's permitting rules and handles every step above for you: the zoning check, coordinating plans, plan review, inspections and closeout.

Get a free quote

Free quote

Tell us what you're dealing with.

Send the violation notice, permit number or project details. We'll review it and come back with a plan and a quote.

Call or text (305) 338-6399elizabeth@thepermitqueen.netOffices in Coral Gables and BrickellMon to Thu 8:30 am to 4 pm · Fri 8:30 am to 1 pm · Closed weekends¿Prefiere español? Llámenos. Hablamos español.
CallGet a quote